1. *Pot, Set, and Cure Times are for Riley Rods RR-6# Pour Foam and RR-321 Epoxy.  If using different products refer to their specifications. Read and follow product label directions and warnings; read MSDS for detailed product safety information prior to use.

  1. STEP 5

Materials/Tools for Step 4

  1.   RR-321 Epoxy

  2.   Small Brush

  3.   Rod Wrapper

SEAL THE FOAM CORE

  1. Remove mandrel with foam core from lathe.

  2. Mix small batch of RR-321 Epoxy (2 Parts RR-300 Resin to 1 Part RR-21 Hardener) to skim coat foam core.

  3. Seal coat the foam core with RR-321 Epoxy; let dry for at least 3 hours on a rod dryer.

  1. Pot Life: 40 minutes*

  2. Tack Free: 3 hours*

  3. Set-Time: 7 hours*

  4. Full Cure Time: 24 hours*

FOAM CORE GRIP PROCESS

  1. STEP 1

  2. STEP 2

  3. STEP 3

  4. STEP 4

  5. STEP 5

  6. STEP 6