1. *Pot, Set, and Cure Times are for Riley Rods RR-6# Pour Foam and RR-321 Epoxy.  If using different products refer to their specifications. Read and follow product label directions and warnings; read MSDS for detailed product safety information prior to use.

Materials/Tools for Step 5

  1.   RR-321 Epoxy

  2.   Small Brushes

  3.   Nitrile Gloves

  4.   Utility Knife

  5. Fine & Very Fine Sandpaper
       (220-1200 grit)

  6.   Scotch Brite (Very Fine and Ultra
        Very Fine)

  7. Reamer

  8. Denatured Alcohol

  9. Small Towel or Cloth

TRIM, PREP AND FINISH

  1. Place mandrel with foam core on lathe

  2. Trim cable ties with utility knife; remove cable ties 

  3. Remove excess sleeving and clean up grip with parting tool

  4. Fix imperfections (e.g. scuff fish eyes, slice off bumps with razor, etc.)

  5. Use Scotch Brite and/or lightly sand with 600+ grit sandpaper

  6. Clean thoroughly with denatured alcohol to remove all residue.

  7. Apply 1-2 coats of RR-321 Epoxy to reach desired finish.  If using pigments or
    micro flakes mix into the epoxy before applying finishing coats.
       Note:   The desired affect of pigments/micro flakes is subjective so there’s no
                   “right amount”.  However, we recommend starting with a very small amount
                   and go from there.   

  8. Let cure for 3 hours between coats; 7 hours to finish

  9. Use Dream Reamer or comparable tool to ream foam core to fit blank.

  10. Wipe down handle with cloth.

  11. Handle is done and ready to be bonded to blank (we suggest Rod Bond)!!

    Note:  Use denatured alcohol to immediately remove glue or bonding during install on blank.

  1. Pot Life: 40 minutes*

  2. Tack Free: 3 hours*

  3. Set-Time: 7 hours*

  4. Full Cure Time: 24 hours*

FOAM CORE GRIP PROCESS

  1. STEP 1

  2. STEP 2

  3. STEP 3

  4. STEP 4

  5. STEP 5

  6. STEP 6